The Ghazipur WtE plant in East Delhi will enter test operation next month. The plant faced several delays since 2010 when one partner left the project (see also issue 2010-19). 1,300 tonnes of waste will be used to generate 12 MW of electricity, once the plant is fully operational. The RDF burned is produced at the site, as reported by the source.