The National Green Tribunal (NGT) has directed the Jaypee Group to run its waste processing plant in Dadu Majra at optimum capacity, according to Tribune India. The plant has a capacity of 550 metric tons a day but the firm has been processing quite less than the waste generated in the city. The city produces about 450 metric tons of waste per day.
Picture credit: municipal solid waste, public domain